User's Manual

Table Of Contents
35
Users Manual of GPL-8000
Installing the OLT
This section describes how to install your GPON OLT and make connections to the GPON OLT. Please read
the following topics and perform the procedures in the order being presented. To install your GPON OLT on a
shelf, simply complete the following steps.
2.3.1. Rack Mounting
To install the GPON OLT in a 19-inch standard rack, please follow the instructions described below:
Step 1: Place the GPON OLT on a hard flat surface, with the front panel positioned towards the front side.
Step 2: Attach the rack-mount bracket to each side of the GPON OLT with supplied screws attached to the
package.
Figure 2-9 shows how to attach brackets to one side of the GPON OLT.
Figure 2-9 Attaching Brackets to the GPON OLT.
You must use the screws supplied with the mounting brackets. Damage caused to the
parts by using incorrect screws would invalidate the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite side.
Step 5: After the brackets are attached to the GPON OLT, use suitable screws to securely attach the brackets
to the rack, as shown in Figure 2-10.