User's Manual

Table Of Contents
36
Users Manual of GPL-8000
Figure 2-10 Mounting the GPON OLT on a Rack
2.3.2. Installing the Uplink Port
The sections describe how to insert an SFP transceiver into an SFP slot and UTP copper cable to RJ45 port.
The SFP transceivers are hot-pluggable and hot-swappable. You can plug in and out the transceiver to/from
any SFP port without having to power down the GPON OLT as Figure 2-11 shows.
Figure 2-11 Plugging in the SFP Transceiver