Quick Guide
5
3. Wiring the Power Inputs
The Upper Panel of the Industrial Managed Switch indicates an inlet power
socket and consists of one green terminal block connector within 6 contacts. Please
follow the steps below to insert the power wire.
1.Insert positive/negative DC power wires into Contacts 1 and 2 for Power 1, or
Contacts 5 and 6 for Power 2.
DC9-48V,AC24V
Max. Fault Alarm Loading: 24V, 1A
DI1 DO0 DO1DI0 GNDGND
V1+ V2+
PWR1
PWR2Alarm
DC Input: 9-48V
, 4A max.
AC Input: 24V
, 2A max.
1 2 3 4 5 6
1 2 3 4 5 6
Figure 3-1: IGS-6325-5X1T Upper Panel
2.Tightenthewire-clampscrewsforpreventingthewiresfromloosening.
1 2 3 4 5 6
V1+ V1- V2+ V2-
Power 1 Power 2
Figure 3-2: Power1 & 2 Pins of Terminal Block Connector
Note
1. The wire gauge for the terminal block should be in the range
from 12 to 24 AWG.
2.Please check the AWG Ampere specification before connecting
PLANETIndustrialManagedSwitch.