User Manual

32
Users Manual of XGS-6350-24X4C
Step 1: Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front
side.
Step 2: Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to
the package.
You must use the screws supplied with
the mounting brackets. Damage caused to the
parts by using incorrect screws would invalidate the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite side.
Step 5: After the brackets are attached to the Managed Switch, use suitable screws to securely attach the
brackets to the rack.
Step 6: Proceeds with Steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and
supply power to the Managed Switch.
2.2.3 Installing the SFP/SFP+/QSFP28 100G SFP Transceiver
The sections describe how to insert an SFP/SFP+/QSFP28 100G SFP transceiver into an
SFP/SFP+/QSFP28 100G SFP slot. The SFP/SFP+/QSFP28 100G SFP transceivers are hot-pluggable and
hot-swappable. You can plug in and out the transceiver to/from any SFP/SFP+/QSFP28 100G SFP port
without having to power down the Managed Switch, as Figure 2-4 shows.
Figure 2-4 Plug in the SFP transceiver
Approved PLANET SFP/SFP+/QSFP28 100G SFP Transceivers
PLANET Managed Switch supports both single mode and multi-mode SFP/SFP+/QSFP28 100G SFP