Instructions / Assembly
19
58³⁄₄"
58³⁄₄"
2
"
x
6
"
x
72"
2
"
x
4
"
x
7
2
"
2
"
x
4
"
x
7
2
"
2
"
x
6
"
x
72"
Items for STEP 3:
(2) 2" x 6" x 72" boards
(2) 2" x 4" x 72" boards
(4) ³₈" x 3" lag screws
(
4) ³₈" washers
(32) #8 x 2¹⁄₂" deck screws
P
osition boards between assemblies as
shown. Keep square while securing with
#8 x 2¹⁄₂" deck screws.
Install ³₈" x 3" lag screws with
³₈" washers at .
G
Note: If you are using 2" x 6" lumber for
your deck boards in place of
5/4" x 6" lumber, this dimension
must be 58
¹₂
". The reason is
2" x 6" lumber is
¹₄"
thicker than
the 5/4" x 6" lumber called for in
this plan.
4"
x
4
"
4"
x
4"
4"
x 4
"
4"
x 4"
Position roof assembly so both sides of roof overhang 4" x 4" boards equally.
Secure each corner with two #8 x 2¹⁄₂" deck screws and one ³₈" x 3" lag screw
with ³₈" washer. (See below for detail of screw placement.)
Lift tower assembly upright and position in desired location.
Detail of Screw
Placement
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
1
/
4
" Dia. for
3
/
8
" x 3" lag screws
Items for STEP 4:
(1) Roof Assembly
(4) ³₈" x 3" lag screws
(4) ³₈" washers
(8) #8 x 2¹⁄₂" deck screws
Caution: Ground must be level.
Installation on a hill or
incline will create
unsafe conditions.
B
B
B
B
G
G
G
G
SEE PAGES 6 & 7 FOR
HOLE PATTERNS