Instructions / Assembly
54
46³|₄"
46³|₄"
80¹|₂"
2
" x 4" x 28¹⁄₂" (3)
2" x 6" x 28¹⁄₂" (2)
Items for STEP 3:
(2) 2" x 6" x 28¹⁄₂" boards
(3) 2" x 4" x 28¹⁄₂" boards
(4) ³₈" x 3" lag screws
(
4) ³₈" washers
(40) #8 x 2¹⁄₂" deck screws
Position boards between assemblies
as shown. Keep square while securing
with #8 x 2¹⁄₂" deck screws.
Install ³₈" x 3" lag screws with
³₈" washers at .
G
B
B
G
G
SEE PAGE 6 FOR
HOLE PATTERNS
PATTERN
B
90˚
Items for STEP 4:
(1) Roof Assembly
(4) ³₈" x 3" lag screws
(4) ³₈" washers
(8) #8 x 2¹⁄₂" deck screws
4"
x
4"
4"
x
4"
4
"
x 4"
4
"
x 4"
Position roof assembly so both sides
of roof overhang 4" x 4" boards equally.
Secure each corner with two #8 x 2¹⁄₂"
deck screws and one ³₈" x 3" lag screw
with ³₈" washer. (See below for detail
of screw placement.)
Lift tower assembly upright and position in
desired location.
Caution: Ground must be level. Installation
on a hill or incline will create unsafe
conditions.
Detail of Screw
Placement
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
1
/
4
" Dia. for
3
/
8
" x 3" lag screws
PATTERN
G
Note: If you are using 2" x 6" lumber
for your deck boards in place of
5/4" x 6" lumber, this dimension must
be 46
¹₂
". The reason is 2" x 6" lumber
is
¹₄"
thicker than the 5/4" x 6" lumber
called for in this plan.