Instructions / Assembly

64
Items for STEP 12:
(2) Step 11 Assemblies
(4) ³₈" x 3" lag screws
(4) ³₈" washers
(16) #8 x 2¹⁄₂" deck screws
Items for STEP 11:
(8) U-straps
(8) 3 link chain
(16) ¹⁄₄" x 1¹⁄₂" lag screws
U
sing a U-strap as a drill guide. Drill two ¹⁄₈" holes 1"
deep at dimensions shown. Install chains to U-straps.
Secure with ¹⁄₄" x 1¹⁄₂" lag screws.
Repeat for second assembly.
Note: Do not connect the monkey rings until the
playset has been properly installed and is
ready for use.
6¹|₂"
15"
15"
15"
13¹|₂"
SEE PAGE 7 FOR
HOLE PATTERNS
Position Towers approximately
six feet apart as shown.
Position Step 11 Assemblies as
shown.
Secure with #8 x 2¹⁄₂" deck
screws and ³₈" x 3" lag screws
with washers.
P
ATTERN
G
G
G
G
G
6¹|₂"
15"
15"
15"
13¹|₂"