Instructions / Assembly

Continuous Handrail
For Easy Play Deck
Access
Great Alternative
To Basic Wooden
or Metal Rungs
Escalones
para trepar
Climbing Steps
Climbing Steps
Steps
C Steps
®
PS 8860
L
T 6409 R2
Different Size Opening Options
If the size of the opening in the play deck is not
21
¹⁄₂", you need to adjust the size of your steps.
T
op Step equals the size of the opening minus ¹⁄₂"
Standar
d Step equals the size of the opening plus 2"
T
he Climbing Steps can be mounted
on 48" or 60" play decks.
Please follow the appropriate directions below:
1. Place the left (L) step side rail on a flat
work surface. Insert one 2" x 6" x 21"
top step into the top hole.
Note: This hole does not go
completely through the side rail.
Insert three 2" x 6" x 23¹⁄₂" standard steps
into the remaining holes until they are flush with
the outside of the side rail. (Fig. 1)
2. Insert the right (R) step side rail
on top of the existing boards until
t
he standard boards are flush with
t
he outside of the side rail.
(
Fig. 2)
3. Install the Climbing Steps Assembly to
your tower: Position the Climbing Steps
Assembly into the 21¹⁄₂" opening of
y
our play deck so that the top surface
o
f the top step is flush with the top
s
urface of the play deck. Push side rails
of Climbing Step Assembly forward
until they contact the play deck.
Note: The steps must be positioned
as specified, otherwise a head
entrapment or tripping hazard
could exist. Secure the Climbing Step
Assembly to the play deck using three #14 x 1
¹⁄₄" pan head screws on
each side as shown. (Fig. 3)
4. Make sure that all the standard
steps are flush with the outside
sides of the Climbing Steps
Assembly. Secure each step
to the side rails using two
#14 x 1
¹⁄₄" pan head screws for
each step as shown.
(Fig. 4)
MOUNTING INSTRUCTIONS
Tools Required: Drill, ¹⁄₈" Drill Bit, Tape Measure, Saw, Square,
Rubber Mallet, Phillips Screwdriver, Safety Glasses
M
aterials Required
: (
1) 2" x 6" x 8'
Hardware Included:
Cutting Guide
:
2" x 6" x 8' – one (1) board required
Top Std. Std. Std.
Step Step Step Step
48" PLAY DECK
F
ig. 2
Fig. 1
Fig. 4
Fig. 3
3. Install the Climbing Steps Assembly
to your tower. Position the Climbing
Steps Assemb
ly into the 21
¹⁄₂" open-
ing of your play deck so that the top
surf
ace of the top step is 12" from
the top surface of your play deck (48"
from the g
round). Secure the Climbing
Step Assemb
ly to the pla
y dec
k using
three #14 x 1
¹⁄₄" pan head screws on
each side as shown. (Fig. 3)
T
ools Required: Drill, ¹⁄₈" Drill Bit, Tape Measure, Saw, Square,
Rubber Mallet, Phillips Screwdriver, Safety Glasses
Materials Required
:
(1)
2"
x
6"
x
8'
(1) 2"
x 4" x 28
¹⁄₂"
(8)
#8
x
2
¹⁄₂"
Dec
k Scre
ws
Hardware Included:
Cutting Guide:
Fig. 4
Fig.
2
Fig. 1
60" PLAY DECK
2" x 6" x 8' – one (1) board required
Top Step 3 Standard Steps
2" x 4" x 8' – one (1) board required
Filler Board
MOUNTING INSTRUCTIONS
12"
5.
Install one 2" x 4" x 28
¹⁄₂" filler
board an equal distance between
the top of the step and the bottom of the
dec
k suppor
ts
.
The gaps left should be
approximately 1
³⁄₄".
NO
TE:
The steps m
ust be positioned
as specified. The gaps must not
e
xceed 3
¹⁄₂" otherwise a head entrap-
ment could exist.
Secure with eight #8 x 2¹⁄₂" dec
k scre
ws
.
(Fig. 5)
Fig. 5
4.
Mak
e sure that all standard steps
are flush with the outside sides of
the Climbing Steps Assembly. Secure
each step to the side rails using two
#14 x 1
¹⁄₄" pan head screws for
each step as shown. (Fig. 4)
1. Place the left (L) step side rail on a
flat work surface. Insert one 2" x 6"
x 21" top step into the top hole.
Note: This hole does not go
completely through the side rail.
Insert three 2" x 6" x 23¹⁄₂"
standard steps into the
remaining holes until
the
y are flush
with the outside
of the side rail.
(Fig.
1)
2.
Insert the right (
R)
step side
rail on top of the existing
boards until the standard
boards are flush with the
outside of the side rail. (Fig. 2
)
Pasamano continuo
para un acceso fácil a
la plataforma de juegos
Una gran alternativa
a los rudimentarios
escalones de madera
o de metal
Escalier
d’escalade
Main courante continue
permettant l’accès facile
à la plate-forme de jeux
Excellente alternative
aux barreaux de bois
ou de métal de base
Lumber required - see back
(purchase separately)
Madera necesaria – vea el reverso
(compre por separado)
Bois nécessaire – voir au verso
(achetez séparément)
Climbing Steps PS 8860
PlayStar, Incorporated
Janesville, WI 53547
P
atent Number
:
US
6,991,550
©
2005, 2004 Pla
yStar
, Inc.
21" 23¹⁄₂"23¹⁄₂"23¹⁄₂"
21" 23
¹⁄₂"23¹⁄₂"23¹⁄₂"
28
¹⁄₂"
Impor
tant! Intended f
or residential use by children
ages 2 to 10, only on properly installed PlayStar play-
sets. Before use refer to complete safety guidelines in
your original playset, at www.playstarinc.com, or at
1-888-752-9782. Specifications subject to change
without notice.
Important! Conçu pour une utilisation résidentielle
par des enfants de 2 à 10 ans, sur des portiques de
jeux PlayStar montés adéquatement seulement.
Avant l’utilisation, consulter les directives de sécurité
completes du portique de jeux original à
www.playstarinc.com, or au 1-888-752-9782.
¡Importante! Para uso residencial, para niños de 2 a
10 años y para usarse sólo en conjuntos de juego
PlayStar correctamente instalados. Antes de usar
consulte las normas completas de seguridad de su
conjunto de juego original, en www.playstarinc.com o
al 1-888-752-9782.
Fig. 3
I
nstrucciones disponibles en español:
Llame gratuitamente al 1-888-PLAYSTAR (752-9782)
De lunes a viernes de 8:00 AM a 5:00 PM. C.S.T.
(Hora Central de EE.UU.)
¡Lo ayudaremos con placer!
Mode d'emploi disponible en français:
Numéro d’appel gratuit 1-888-PLAYSTAR (752-9782)
Du lundi au vendredi De 8 h à 17 h,
h
eure normale du centre
C’est avec joie que nous vous aiderons!
(20) #14 x 1¹|₄" Pan Head Screws
Depending on your application,
some hardware may not be used.
(20) #14 x 1¹|₄" Pan Head Screws
Depending on your application,
some hardw
are ma
y not be used.

Summary of content (1 pages)