User's Manual

Table Of Contents
Team2 Help EN
58
Saved training reports can be deleted by selecting them one at a time and clicking the Delete
button.
Graph
There's one setting for both views. The By player view setting has two options, One player per
graph and Selected players in one graph.
When One player per graph is selected, Team
2
software shows individual graphs for the
selected players.
When Selected players in one graph is selected, Team
2
software shows a graph for
each selected player. There's one bar in every graph.
Summary view has also two options, Average and Total.
When Average is selected, Team
2
software shows the results as averages.
When Total is selected, Team
2
software shows the results as totals.
General settings allow you to choose how many days are included in summary view. NOTE: If
training report's date range is shorter than this setting, summary view uses the date range instead
of the setting.
When Show grid is checked, there's a grid displayed in the background of the graphs.
Right-Click Menu
Many features and functions can be accessed quickly by right-clicking an element or an item.
Below are the contents of the right-clik menu on the Training Reports page.
Right-clicking the graph area opens a menu. In Training Reports page the menu consists of the
following features:
Send Graph by E-mail which opens your default E-mail software. The graph is an
attachment in picture format. This is not the same function as File > Send E-mail >
Current view as picture, which prints the whole window as a screen shot.
Copy to Clipboard, which has a submenu (it consists of Graph and Values). The
feature copies a selected item (graph or values) to the clipboard. This is the same
function as Edit > Copy to Clipboard.
Print, which opens a preview window and enables you to print information on paper. This
is the same function as File > Print.
Create Training Report
1. Select a team and open the Training Reports page.
2. Select the training information you want to view as a bar graph from the Bar graph drop-
down list.
3. Select the training information you want to view as line graph from Line graph drop-down
list. NOTE: At least one of the two (bar or line graph) has to be selected.
4. Select the training activity from the Training activity drop-down list. Select All if you
want to include all training activities.
5. Optionally, select the phase from the Training phase drop-down list. Select All if you
wan to include all training phases.