Installation & Assembly

1.Turn off the main switch. adjust
the cold and hot water inlet interface
and the upper and lower water
outlet interface, and use screws to �ix
the valve body in the wall.
3.The installation in the wall is
completed and the switch is opened
for sealing test.
4.Installation panel : the valve body
is �ixed, and panel is covered on the
valve body.
5.Install handle : put the handles on
top and lock with hexagonal wrench.
6.Install the upper outlet pipe :
connect the valve body outlet of
the connecting pipe to the shower
arm interface.
7.Install rain shower : install the shower on the shower arm.
Installation Steps
Cold in
Hot in
2. The holes in the valve body are
Female NPT1/2 threads, You need
Male NPT1/2 dapters to connect to
the pipe, and you should wrap te�lon
tape around the male threads before
installation.
Female NPT 1/2 threads
Male NPT 1/2 threads

Summary of content (1 pages)