Generator Instruction Manual

10 — ENG
ASSEMBLY
Read this manual. Do not attempt to operate
equipment until you have read this Manual for
Safety, Operation, and Maintenance Instruc-
tions.
NOTE: This manual is a general manual. Informa-
tion in this manual may or may not pertain to your
model. Please read carefully.
NOTE: Left and right describes the location of a
part with the operator facing the outlet panel.
REMOVE GENERATOR FROM CARTON
Open carton from top.
Cut carton along dotted lines.
Remove all carton inserts.
Remove generator through opening in carton.
(CTE300, T525, BSV800) Remove shipping block
from under the generator head by unscrewing the
bolt and remove the wood block. It is very impor-
tant that this is removed before starting your
generator. See Figure 1.
IMPORTANT: Before any attempt to start your gen-
erator be sure to check engine oil (See Engine
Operator's manual)
GROUNDING THE GENERATOR
A grounding lug is supplied with the generator for use
when required by local electrical ordinances. Refer to
article 250 of the National Electrical Code to clarify
any needed grounding information. Your local electric
company or a certified electrician should be able to
help you with this information.
Figure 1
TYPICAL INSTALLATION OF BATTERY
(BS600 & BSV800)
Recommended Battery for Electric Start: 12V - 45
A H. or 210 CCA (Cold Cranking Amps)
Purchase battery and battery hardware separately,
not included with unit.
1. Place battery in rack with terminals facing towards
generator head.
2. Place battery bracket (A) over battery as shown in
Figure 3 (opposite battery terminals).
3. Place "L" bolt (B) through top and bottom brack-
ets and secure with wing nut (C).
To Prevent sparks connect the red (positive)
cable to the positive (+) terminal before connect-
ing the black negative cable.
4. Locate the solenoid on the left side of the unit.
See Figures 4 and 5.
For BS600
5. Remove the nut from the solenoid post with the
panel assembly wire harness. Place one end of
the positive (red) battery cable onto this post with
the panel assembly wire. Reassemble nut and
tighten securely. See Figure 4.
Figure 3
Figure 4
Grounding Lug
Figure 2
NOTE: Your engine is already grounded to the frame
by a grounding strap.
Panel Assembly
Wire Harness
Solenoid