Product Manual
52
Assembly Instructions
Step 17 – Skid Steer Hose Routing
• Route high pressures hoses from skid steer to Valve to Hose Fittings as
shown below.
• Note: High pressure hoses supplied by customer.
• Screw finger-tight high pressure hoses to Valve to Hose Fittings.
• Wrench tighten 1.5-3.0 Turns Past Finger Tight
• Connect remaining ends of high pressure hoses to skid steer.
Tools Needed
• Crescent Wrench
(2 needed)
Hoses Supplied by Customer:
Hoses
Hoses
Vertical:
Horizontal:










