Operation Manual

CONTENTS
INTRODUCTION 1-3
Forward
Requirements for Installation
Parts List
Tools Required
SAFETY ALERTS AND PRECAUTIONS 4-6
Alerts
Precautions
INSTALLING THE PT-3000 7-8
Preparation for Installation
Locating on the Frame Rail
Assemble the Mounting Clips, Bolts, and Spacers
Mounting to the Frame Rail
Exhaust Pipe
INSTALLING FUEL PICK-UP TUBE AND LINES 9-11
General Considerations
Install Tank Pick-up Tube
Routing and Connecting Fuel Lines
INSTALLING THE BATTERY CABLES 12
Cable Routing
Connecting to Batteries
INSTALLING THE AC POWER OUTPUT LEADS 12-13
Routing
Terminal Block
Connections
INSTALLING THE DRIVER CONTROL PANEL 14-15
Wiring Schematic
Selecting Location
Mounting
INSTALLING THE POWER OUTLET BOX 15
Selecting Location
Routing Wires
Connections
Mounting
INSTALLING THE OPTIONAL AIRCONDITIONING
AND HEATING SYSTEMS 16-18
FINISHING THE POWERPAC INSTALLATION
Installing Battery Charger
Check List
First Time Start Up
Purging Air from Fuel System