Operation Manual
REQUIREMENTS FOR INSTALLATION
PARTS LIST
1 - PT-3000 Unit
1 - Battery Charger
1 - Terminal block
1 - Terminal block cover
2 - Frame Mounting Angle Brackets (L&R)
8 - ½” x 2 Mounting Bolts, Nuts and Washers
6 - 5/8” x 2 ½” Mounting Bolts, Nuts and Washers
1 - Fuel pickup tube
1 - Cab mounted Start/Stop panel
1 - 1 ¼ rubber grommet
4 - #4 hose clamps
2 - Battery cable ends
2 - Heat shrinks (for battery cable ends)
10 - Sheet metal screws
20 - Wire ties
TOOLS REQUIRED
Typical mechanics tools
Drill
1 ¼” Hole saw
Tape measure
Utility knife
Tubing cutter
½” NPT Tap (for fuel pickup tube)
3/4” Drill bit or tapered drill bit (for ½” NPT tap)
Heavy grease (to keep metal shavings out of fuel tank)
Liquid thread sealant
Transmission jack, forklift or overhead hoist
3










