Installation Guide

Table Of Contents
TETRA MBS UNIT. INSTALLATION GUIDE
F067646PT_2801
Page 24 of 62
en
6.3 INSTALLATION
The MBS has been designed to be mounted on both mast/pole, on a wall or over a PBS Accessory.
This chapter provides the necessary steps to be followed for a right MBS Unit installation.
At least two people are required to carry out the installation of a MBS Unit on a mast/pole.
Note: MBS Unit has been designed to operate in vertical position. In case of being necessary the operation
in horizontal position, the client will must check with the manufacturer. In this case, the range of temperature
will be reduced (-86 ºF to 122 ºF).