Installation Guide

Table Of Contents
TETRA MBS UNIT. INSTALLATION GUIDE
F067646PT_2801
Page 6 of 62
en
2. UNPACKING AND CHECKING
The equipment is supplied with all the necessary materials for the installation, either on a mast, on a
wall or over the PBS Accessory:
MBS Unit includes the followings items
One power connector.
One Ethernet connector
RF super-flexible wire N-Male N-Male.
Brackets for the installation.
Besides, in some types of installation, as detailed below, it is necessary an additional material that is
NOT supplied with the equipment.
IMPORTANT: If any of the necessary elements to carry out the installation process described in this
guide is missing or damaged, please contact your supplier.