Installation Instructions

Multi-Piece Sectional Product
Installation Instructions
For best results, please read and follow all directions
carefully.
1. Avoid exposure to weather. Product carton is not
waterproof. Carton exposed to rain or snow may result in
accummulated water penetrating the back laminates of the
shower pan and soak the glassed in reinforcement supports
causing bulges in the gelcoat surface.
2. Most handling damage is the result of impact blows to
the back of the berglass units.
3. Never drag this berglass product on any surface. Always
carry the pan or use a two wheel dolly.
4. Never drop the berglass shower pan from any height,
not even an inch or stress cracks are likely to occur.
5. Placing objects inside the unit can cause scratches or nicks
to the nished surface. Do not use the shower pan as a
trash receptical! Always place a drop cloth or cardboard on
the oor when working inside the shower.
6. Never clean berglass gelcoat surface with metal tools of
any kind, including razor blades.
PLANNING YOUR INSTALLATION
1. Review the Framing Diagrams in Figure 1. Modify existing
framing if required. For new construction, build framing
structure in accordance with product dimensions and notes
shown in the Framing Diagrams. The two wall Framing
Diagram is for the 6060 3P two wall shower only.
BRIEF OVERVIEW
Please read instructions before beginning the installation.
Note: Unit will not install properly if framing pocket is not
square and of proper size. The dimensions shown in the
FRAMING DIAGRAMS are 1/4” larger than the size of the
shower. This product is manufactured to tight specications.
The 1/4” over sizing is for maneuvering and installation ease. If
1/4” over is not reasonable, sizing closer to the product actual
dimensions is allowable.
When trial tting the shower, use a level to conrm the parts
are level and plumb. If any gaps are present between the
shower and framing, use furring strips to ll the gaps. If the
walls and oorare not level, there may be an excessive gap at
the seams. The unit is designed to allow an 1/8” gap at the
seams.
2. The shower base will be installed, leveled, and fastened
to the framing before the walls are installed. It is essential
the framing pocket be square and plumb for the unit
to install properly. The oor also must have no voids or
out of level conditions. If these are present, they must be
corrected before installation. Floor leveling compound can
be purchased at a local home improvement store.
3. Following the shower pan installation, place the back wall
sections, then the side walls. The parts are indexed to one
another by a slot and pin connection system. The parts are
pushed tight together before connection to the framing
pocket is made. To have a successful installation, two persons
are required.
4. Plan for the location of the shower water control valve.
Note if planning to install the control valve in the back wall of
the shower with a two piece back wall, consider the location
of the seam in the wall. The control valve must be located at
a height where the seam and mounting ange do not cause
a conict with placement of the control valve, or water supply
lines. These considerations are not necessary if installing on
the one piece back wall, or side wall. Plan for routing the water
supply lines to the control valve installation location.
Tools/materials you might need for proper installation
• hammer
• drill with phillips screw bit
• 1/2” notched trowel
• 1/8” drill bit
• spatula
• grease pencil (china marker)
• auger mixing tool for drill
• caulking gun
• 4’ level
• 2’ level
• nails
• (50+) 1 1/4” wood screws
• solid wood flooring adhesive- (2) one gallon buckets
per shower
• two gallons of water - for mixing bedding
compound and water test around drain
• tube of white bathroom caulking
• (2) tubes of 100% clear silicone caulking
• (3) 8’ 2x4s
• (1) 8” long 2x4
• (1) 24” long 2x4
• (2) large wiping cloths
• self-caulking shower drain fitting

Summary of content (12 pages)