Installation Guide

PBS installation guide
Parelec Inc.
8
PBS channel
indicator #1
RF ports.
TCP/IP port #1
Antenna
port
RX, TX
ports
Control port
Control port
Installation:
1. Connect the PBS to the power supply. Verify that the power indicator LED (#1) turns
on.
Warning: The power consumption of the unit is 12V-2.0A,. In order to
ensure proper functioning of the unit, use the power source supplied with the
unit or a compatible power unit with the same polarity and voltage.
2. Connect the amplifier unit. Pay attention to TX and RX
ports. Use only the supplied cables.
3. Connect the antenna to the amplifier’s antenna
connector. You can use only antennae supplied by Precyse
technologies. Other antenna types are not supported.
Verify that the appropriate PBS channel indicator LED
flashes.
4. Connect the PBS IP port to the server using the
appropriate IP port on the PBS unit. The Ethernet LED on
the connector will light indicating the connectivity.
Note: The PBS unit has 4 holes in the base for fixing the unit in place. Use 4 screws
and washers to fasten the unit. DO NOT DRILL HOLES IN THE UNIT OR OTHERWISE
CHANGE THE PROTECTIVE BOX OF THE PBS.
5. Amplifier unit: connect it according to the following block diagram. Use only
cables and connectors approved by Precyse Technologies.