Equipment Enclosure for Plenum Ceilings Installation Instructions

Installation Instructions Page 5
GB-PLEN1
Step 5. Locate the four (4) mounting holes
on the mounting rails.
Step 6. Align the mounting slots on the
GB-PLEN1 with the mounting holes on
the mounting rails.
Step 7. Use four (4) M5 x 10mm screws to attach
the GB-PLEN1 to the mounting rails.
Mounting
Points
Mounting
Rails
M5 x 10mm Screws
You may wish to pre-install your electronic components inside the enclosure at this time. If so, make sure to leave the
mounting slots accessible.