Specifications

Page 6 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PP-FCTA
1) Once the ceiling plate assembly is resting on the t-bar
frame rails, use a screwdriver to tighten the four (4)
M5 x 16mm combo screws.
2) Slide and center the upper plate assembly over the
hole that was cut in the tile.
3) Tighten all four (4) wing nuts.
1) Cut the tile where the electrical box is going to be
secured.
2) Using (commercially available) hardware depending
on electrical installation environment, install the
electrical box and secure it to the ceiling plate
assembly.
3) Make all electrical connections at this time.
Securing the Ceiling Plate
Do not overtighten the mounting screws.
M5 x 16mm Combo Screw
Tiles
T-Bar Frame Rails
Electrical Box Cut-out Removal
Electrical installation should be completed by a certied
electrician.
Proceed to the ″Electrical Box Cut-out Removal″ section
below.
Upper Adapter Plate
Upper Plate Assembly
Electrical Box
Cut-out
Electrical Box
(Commercially
Available)
Proceed to the ″Attaching the Turnbuckles″ section.
PP-FCTA