Specifications
SPI-EXT
Page 10 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Step 2
Insert the mounting hardware, as determined in the
“Selecting the Mounting Hardware” section on page
9, through the leveling barrel into the threaded insert of
the projector.
Do not tighten the mounting hardware at this time.
Step 3
Raise or lower each of the mounting legs, by rotating the
leveling barrels, until all of the mounting legs are at an
equal height.
• Lower the mounting leg by rotating the leveling
barrel counter-clockwise.
• Raise the mounting legs by rotating the leveling
barrel clockwise.
➊
Identify the projector’s approximate front-to-back
center of gravity. Place your hands on each side of
the projector and gently lift it an inch from the surface
on which it is resting. Carefully adjust your grip on the
projector until it seems balanced from front-to-back.
Mentally note the apparent center of gravity.
➋
Identify the projector’s approximate side-to-side
center of gravity. Place your hands on the front and
back of the projector and gently lift it an inch from the
surface on which it is resting. Carefully adjust your
grip on the projector until it seems balanced from
side-to-side. Mentally note the apparent center of
gravity.
➌
If not already, place the SpiroLock™ Projector Plate
on top of the mounting legs with the center of the
plate as close as possible to the projector’s center of
gravity.
Step 4
Attaching the Projector Plate (cont’d)
Side-to-Side
Center of Gravity
Front-to-Back
Center of Gravity










