DATE STAMP Assembly Instructions CONTACT US FIRST parts@prepacmfg.com 1-877-PREPAC1 1-877-773-7221 Mon - Fri • • 7am - 4pm PST 10am - 7pm EST For help with assembly If you have received a damaged or defective part or are missing hardware. We will process replacement parts in 2 business days or less. Parts are shipped via UPS Ground or mail. Before you call please: 1) Record the following information from the shipping label on the outside of the box.
Cabinet Parts C1 C2 C4 C5 C6 C3 C7 C1 Top (1) Dessus TP-10055-G gray / gris C5 Upper Stabilizer (1) Renforcement supérieure ST-10066 unfinished / non-fini C2 C3 Gable (1) Pignon GA-10057 unfinished / non-fini Left Side (1) Côté gauche SL-10057-G gray / gris C6 C7 Lower Stabilizer (1) Renforcement grand ST-10067 unfinished / non-fini Bottom (1) Bas BT-10045-G gray / gris C4 Right Side (1) Côté droit SR-10057-G gray / gris Parts are not labelled but are easy to identify.
Drawer Parts RM-0921 Small Metal Drawer Sides Petit tiroir métallique côté D1 D4 D2 D5 D3 Small Cabinet Slides Petite abinet glisse D2 D1 Small Drawer Back (1) Arrière du tiroir petit white / blanc DK-10032-W D3 Small Drawer Bottom (1) Fond du tiroir petit white / blanc DB-10033-W Small Drawer Front (1) Avant de tiroir petit gray / gris DF-10033-G RM-0921 Small Metal Drawer Box (1) Includes: Left (D4) & Right (D5) Small Metal Drawer Sides Small Cabinet Slides RM-0921 Métal petite boîte de tiroir
BEFORE YOU BEGIN Identify ALL parts and hardware to ensure everything is included. AVANT DE COMMENCER Identifier toutes les pièces et le matériel afin de s’assurer que tout est inclus.
1a 1b Insert cams into the top of the Left (C3) and (C4) Right Sides Insérez des cames dans les côtés gauche (C3) et droit (C4). Attach Rail Hooks to the Left (C3) and Right (C4) Sides as shown. Use wrench to tighten nuts. Fixez les crochets de suspension aux côtés gauche ����� (C3) ��������� et droit ����� (C4). Nylon Lock Nut Écrous de blocage en nylon Insert cams with the opening facing toward the hole for the twister dowel.
2 Insert cams into the Upper Stabilizer (C5) Insérez des cames dans la renforcement supérieure (C5). Insert cams with the opening facing toward the hole for the twister dowel. C5 Insérez les cames dans l’ouverture faisant face au trou du goujon à visser.
4a Attach drawer slides to Left (C3) and Right (C4) Sides with Euro Screws Attachez les cabinet glisse aux côtés gauche (C3) & droit (C4) avec les Vis Euro Euro Screw Vis “Euro” Small Cabinet Slides at the top Petit cabinet glisse en haut C4 C3 Green Twister Dowel Goujons verts à visser 4b Insert green twister dowels into Left (C3) & Right (C4) Sides Insérez les goujons verts à visser dans les ������������� côtés gauche ������� (C3) ����� et ��� droite (C4) C4 C3 Page of 20
5a Attach Upper Stabilizer (C5) to Left (C3) and Right (C4) Sides and tighten cams Fixez le renforcement supérieure (C5) aux côtés gauche (C3) et droit (C4) avec les Vis Confirmat 5b Attach Lower Stabilizer (C6) to Left (C3) and Right (C4) Sides with Confirmat Screws Fixez le renforcement inférieure (C7) aux côtés gauche (C3) et droit (C4) avec les Vis Confirmat Tightening Cams Pour serrer les cames Unlocked Déverrouillées Locked Verrouiller en tournant C4 C5 C3 C6 Confirmat Screw Vis Confirmat
6a Insert green twister dowels into Top (C1) Insérez les goujons verts à visser dans le dessus (C1) Green Twister Dowel Goujons verts à visser 6b C1 Tightening Cams Pour serrer les cames Attach the Top (C1) and tighten cams. Attachez le dessus (C1) et serrez les cames.
The following steps apply to both large and small drawers Les étapes suivantes s’appliquent à la fois aux grands et petits tiroirs 7a Wood Dowel Goujons de bois Insert wood dowels into small (D3) and large (D8) drawer fronts Insérez les goujons de bois en avant de tiroir petit (D3) et grand (D8) D3 D8 7b Attach the bracket to the drawer front AS SHOWN BELOW Attachez l’ensemble support à l’avant du tiroir, COMME ILLUSTRÉ CI-DESSOUS Press bracket in firmly, then tighten screws Appuyez sur le support f
7d Slide the small (D2) and large (D7) drawer bottoms toward the bottom of the drawer sides until they connect with the metal frame. The two metal tabs on each drawer side go into the holes on the drawer bottom. The wood dowels will remain uncovered Faites glisser la petite (D2) et de grande taille (D7) tiroir bute vers le fond du tiroir côtés jusqu’à ce qu’ils se connectent avec le châssis métallique.
7f Attach handels with screws provided Fixez les poignées avec vis fournies Inserting Drawers Insertion de tiroirs We recommend inserting drawers AFTER you complete the wall mounting steps in the next section. Nous recommandons d’insérer les tiroirs après que vous avez terminé le montage mural étapes dans la section suivante.
Installing Hang Ups Garage Cabinets 2 people required Read through all installation steps before beginning ONLINE HELP Pour suspendre les armoire au mur, vous aurez besoin de 2 personnes Lisez bien toutes les étapes de cette installation avant d’entamer la tâche. L’AIDE EN LIGNE To see a how-to installation video, click on “How to Install Prepac’s Garage Storage Collection” on the Assembly page in the Support section of our website: www.prepacmfg.
Hanging Multiple Cabinets Pour suspendre plusieurs armoires We will illustrate how hang multiple cabinets using the sample configuration below. Nous allons illustrer comment accrocher plusieurs armoires à partir de l’exemple de configuration ci-dessous. 1. On your wall, mark where the cabinets will be positioned with tape or a pencil 2. Determine the number of Metal Rails and Connecting Braces needed. You may not need all rails 3.
The illustration below shows where the Metal Rails & Connecting Braces should be attached to the wood studs for this configuration L’illustration ci-dessous montre où les rails métalliques & la connexion les accolades ne doivent être connectés au bois goujons pour cette configuration NOTE: Rails and Braces are shown ABOVE cabinets for clarity REMARQUE : Les rails et les accolades sont indiqués ci-dessus les armoires pour plus de clarté 1/8” For the Base Cabinets, cut BOTH METAL RAILS.
Installing Hang Ups Garage Cabinets Installation “Hang Ups” Garage armoires 1 For Base Cabinets, measure 31½ inches from the floor and make multiple marks along the wall Pour armoires de base, mesurer 31½ pouces du sol et faire plusieurs repères le long du mur 31½ 2 With a level, connect the marks Avec un niveau, connectez les marques Page 16 of 20
3 Find the center of the wall studs and mark the location of each stud along the line. Studs are typically 16 inches apart center to center. Trouver le centre du mur et marquer l’emplacement de chaque goujon le long de la ligne. Les goujons sont généralement de 16 centimètres l’un de l’autre centre à centre. 16” 3/16th inch drill bit 3/16ème pouces foret 3b Using a 3/16th inch drill bit, pre-drill holes 3 inches deep at the locations you had marked.
4 Hang the First Rail Accrocher la première position de Rail Position the Metal Rail over the pre-drilled holes and insert wood screws into the first & second holes. Tighten screws with the Allen Key provided. Positionnez la piste de métal sur les trous pré-percés et insérez les vis à bois dans le premier & deuxième trous. Serrer les vis avec la clef Allen fournie.
6 Hanging the Second Rail Accrocher le deuxième position de Rail Slide the second Metal Rail BEHIND the Connecting Brace Faites glisser le Rail Métallique deuxième derrière le connectant le renfort Secure the Connecting Brace to the Second Rail Sécuriser la connexion renfort pour le deuxième rail Page 19 of 20
7 Carefully hang the cabinet onto the Metal Rail until it locks into place. Laisser pendre soigneusement le cabinet sur la rail métallique jusqu’à ce qu’elle se verrouille en place. Make sure the Rail Hook slides fully into the notch on the Metail Rail Track. Assurez-vous que le crochet de Rail de diapositives pleinement dans l’encoche du Metail voies de chemin de fer.