Install Instructions

4515 E. 139th Street Grandview, MO 64030 | (800) 362-9055 | PRIER.com
Installation, Operation & Maintenance Instructions for the
PRIER C-108/208 Diamond Series Hot and Cold Wall Hydrant
Please leave this sheet for the property homeowner
Thank you for purchasing the PRIER C-108/208 Diamond Series Hot and Cold Wall Hydrant, the nest quality hot and
cold wall hydrant available. Your C-108/208 will provide you years of dependable service with little or no maintenance.
1. Determine the location for the installation of the hydrant. The valve must be installed into a heated area of the structure that
will not drop below freezing. Ensure there is adequate work room in the interior of the structure for securing the hydrant to the
plumbing piping.
2. The PRIER C-108/208 is designed for installation for either vertical or horizontal application. The hose threads must be oriented
in the DOWN position then locked into place. If the hose thread is not oriented properly, the water will not be able to drain from
the hydrant and freeze damage may occur.
3. Bore 2 holes in the size listed above at 3 1/2” centers through the wall in the desired position for the installation.
4. All freezeless wall hydrants require a slight downward pitch to aid the draining process of the hydrant once the product is turned
to the “off” position.
5. Ensure supply piping is free of debris, solder and sealants.
6. If you are planning to solder the connection (D, S or F style seats), be certain the hydrant is in the fully open position to prevent
seat damage from the heat.
7. Connect the water supply piping to the freezeless wall hydrant as desired. With a closed-end hose on the valve creating back
pressure, test the installation for leakage.
8. After the water supply connection is made, secure the hydrant to the structure using appropriate screws through the two mounting
holes on the casted back ange.
INSTALLATION
Installation procedures may vary slightly depending on the seat option purchased and the installation inlet options. PRIER freezeless
wall hydrants are available with the following inlet options:
OPERATION
MAINTENANCE
Operation of the C-108/208 Diamond Series Hot and Cold Wall Hydrant is a simple process. Water ows through the hydrant after
turning the handles (or operating key for the C-208 style) counter-clockwise to the “on” position. Turn off the hydrant by turning
the handle clockwise to the “off” position.The hydrant will drain for a few moments. If the dripping persists after a few moments,
tighten the handle slightly until the dripping stops. Be careful not to overtighten the hydrant. The C-108/208 incorporates a backow
preventer that operates as a check valve in the rare case that water is forced backwards into the valve. The backow preventer has been
tested to 125 PSI pressure.
ALWAYS REMOVE HOSE DURING FREEZING TEMPERATURES
INTENDED FOR IRRIGATION USE AND OUTDOOR WATERING
PER ASSE 1019, DO NOT LEAVE ON FOR MORE THAN 12 CONTINUOUS HOURS
The C-108/208 Diamond Series Hot and Cold Wall Hydrant leaves the factory fully air tested and operational. It is treated
with an FDA approved lubrication. The hydrant requires no scheduled maintenance to provide long life.
Inlet Style Inlet Specications Hole Size
D 1/2” MPT x 1/2” SWT 1” Hole
S 1/2” SWT x 3/4” Push-On 1” Hole
X 1/2” Crimp PEX 1” Hole
W 1/2” Wirsbo® PEX 1” Hole
C 1/2” CPVC 1” Hole
G 1/2” SharkBite Push-Fit 1” Hole
Y 1/2” Press-Fit 1” Hole
T 3/4” MPT x 1/2” FPT 1 1/8” Hole
F 3/4” SWT 1 1/8” Hole
FX 3/4” Crimp PEX 1 1/8” Hole
FW 3/4” Wirsbo® PEX 1 1/8” Hole

Summary of content (1 pages)