Instructions

Installation
Assembly instruction
®
Telefon
+49 8638 / 88 55 92 00
Telefax
+49 8638 / 88 55 92 99
info@primo-gmbh.com
www.primo-gmbh.com
Primo GmbH
Gebrüder-Dickow-Str. 2
84478 Waldkraiburg
Stand 07/2018
Mark the first box and drill a
Ø 82 mm hole.
1
Insert and adjust the drilling template
and drill another holes.
2
Wet the bore.
3
Combinations, standard distance
71 mm.
4
Lathering the box, the side clips set
the plaster thickness.
5
Foam spreads evenly, through the side
tabs.
For exterior walls, please completely
foam (free of thermal bridges).
6
Lead the pipe and the cable in. Press on
the plaster cover.
7
Remove the SCS connection after
plastering.
8
Time saving wiring based on removing
the SCS connection.
9
Quick assembly in the masonry
Thermal bridge free according to
DIN standard 18015-5
Thermo switch box
For brick T7, T8, T9, Ytong and every brickwork