Instructions

Since the introduction of Part 5 of DIN 18015-5 is the electrician
expressly in the duty of a thermal bridge-free installation
perform.
Installation
Assembly instruction
®
Telefon
+49 8638 / 88 55 92 00
Telefax
+49 8638 / 88 55 92 99
info@primo-gmbh.com
www.primo-gmbh.com
Primo GmbH
Gebrüder-Dickow-Str. 2
84478 Waldkraiburg
Stand 07/2018
Thermo switch box
For brick T7, T8, T9, Ytong and every brickwork
Mark the first box and drill a
Ø 82 mm hole.
1
Remove the side clips.
2
Quick installation in full thermal insulation (ETICS)
Lathering the box.
3
The lather distributed evenly.
4
Now you can fill the thermal insulation
and plaster.
5
Order-No. Name VPE
P721 Thermo switch box / Quick installation / soundproofing / ECO / windproof 25
P717 Thermo foam 750 ml 1
P718 Flush-mounted template 82 mm 1
P719 Thermo foam pistol 1
P723 Diamand drill bit 82 mm 1
P724 Drill bit adapter M16 SDS 1
Product clip at:
www.primo-gmbh.com




