Primus Air 40 & Breeze Circuit Replacement Kit Instructions
ECO 101-2720 05/17/2012 Page 2 of 12 3-CMLT-1016 REV G
Important notes before you begin:
PLEASE READ ALL OF THE INSTRUCTIONS BEFORE BEGINNING THE UPGRADE PROCEDURE.
Pay attention to the tightness of each bolt as you remove it in order to get a feel of how tight they need to be
when the parts are reinstalled. Be careful not to over-tighten.
PERFORM ALL TESTING PROCEDURES PRIOR TO RECONNECTING TURBINE TO BATTERY SUPPLY.