Air 30 12v Installation

21 AIR Owners Manual
User Power
Red Lead
Disconnect
Battery
Green Lead
Switch
Earth Ground
Stop
Turbine Ground
Amp
Meter
Black Lead
Turbine Negative
Earth Ground
Battery Bank
Box
Lightning Arrestor
Turbine Positive
Junction Box
Center Junction
Up-Tower
Tower
Chassis
Ground
AIR BREEZE
Wind Turbine
Generator
Fuse or
Breaker
Fig. 9. Single Turbine Installation with Up-Tower Junction Box
Fig. 9 represents a system with an Up Tower Junction Box.
1. Install close to the top of the tower to ease installing a
Lightning Arrestor or
2. Mount close to the tower base to incorporate the stop
switch.
WARNING: Typically installing the box requires drilling holes in the tower – be
careful not to compromise the tower strength.