Installation Guide

PRIMUS WIND POWER DOCUMENT #0070 REV C
PRIMUS WIND POWER Page 13 of 26
2/4/05
Step 5: Tower Base Assembly
To assemble the base, a 6 foot long piece of tower tubing is positioned half way through the base tee as
shown in the drawing below and the set screw tightened to hold it in position (use the 5/16 inch allen
wrench included with your turbine).
The base “T” should now be placed in the position chosen for the base of the tower, perpendicular to the
direction that the tower will be raised. Once assembled, the tower will pivot on the base tube as it is
raised into position.