Instructions / Assembly

ITEM# TOWERINT Scaffolding Assembly & Operating Instructions
3
STEP 1
Attach side brace B to two frames A:
Pull L-shape lock pin at each end of side
brace to the disengaged position.
(See Figure B)
While holding L-shape pin in disengaged
position, place U-channel on each end of
side brace B around leg of frame A at
desired platform height.
Release lock pin and be sure that pin fully
engages into hole in frame A leg
Install Connector Pins F under Lock Pin
on all four sides.
Lock Pin Is Disengaged (Unlocked Position)
Lock Pin Is Fully Engaged (Locked Position)
Figure B
STEP 2
Attach second side brace B to both frames A (REPEAT INSTRUCTIONS IN STEP 1).
WARNING:
BOTH SIDE BRACES MUST BE POSITIONED AT THE SAME HEIGHT ON THE FRAMES
SO THAT THE PLATFORM WILL BE LEVEL.
BE SURE ALL 4 L-SHAPE LOCK PINS ARE FULLY ENGAGED IN HOLES OF FRAMES.
REMOVE THE PLATFORM BEFORE ADJUSTING THE DECK LEVEL.
STEP 3
Install platform C on side braces B so that platform is fully seated within inner channel on top of side
braces.
STEP 4
Rotate the platform clips into the engaged
position. (See Figure C)
Figure C
STEP 5
Install 4 casters D into legs of frames A and with Connector Pins F.