Owner Manual

14
ISLAND HOOD INSTALLATION
3
STEP 2
Install Ceiling Bracket:
• Drill holes into four ceiling marks from Step 1. These holes should hit
ceiling joists or the added framing.
• Cut out a hole in the ceiling where the ducting will go and finish
preparing the ductwork.
• Place chimney bracket against ceiling and screw securely into place.
• Drop the ducting and electrical work through the ceiling.
STEP 3
Install Support Brackets:
• Place brackets vertically inside the four corners of the ceiling bracket.
• Extend the brackets to the appropriate length. (The bottom of the
hood should be 28”-36” above the cooktop).
• Screw all support brackets to the ceiling mounting bracket securing
them tight.
2