Owner Manual

8
WALL HOOD PREPARATION
WHAT YOU WILL NEED
INSPECT RANGE HOOD
PREPARE DUCTWORK
Power Drill
Screwdrivers
Drill Bits
Tape Measure
Masking Tape
Pencil/Marker
Metal or Aluminum HVAC Tape
Level
Wall Anchors*
Scissors/Box Cutter
• Check the contents of your box. They should include:
Range Hood
Wall or Ceiling Mounting Bracket
Hardware
Chimney (Applies to Specific Models)
Support Brackets (Applies to Specific Models)
Transition Duct (Applies to Specific Models)
• Plug in and test controls, lights, and fan.
• Inspect for any damage caused during shipping.
• Report any damage to Proline Customer Service within 14 days of
receipt of hood by calling 877.901.5530 or emailing
support@prolinerangehoods.com
• Do not install if the hood is damaged or you are unsatisfied with it.
*Range hood needs to be installed to secure studs or supports. Wall anchors can be used for
additional support and will vary depending on wall material and the weight of the range hood
being installed.
Plan where your ductwork will be located. Install the proper sized
ductwork and exterior roof or wall cap, depending on where you will be
venting your hood to the exterior. Ductwork should already be punched
through the ceiling (or wall if the ceiling is not an option) and ready to
hook up to the range hood before beginning installation. See venting
requirements above.