User's Manual

proACTIV board User Guide
6
3. Prepare wall
For a conventional solid flat wall, drill the bracket holes with a suitable
masonry drill. Other types of wall may require different drill types.
Insert the appropriate plugs. Screw in the brackets as described in the
TP1443 Installation Leaflet.
4. Fix into position
Two people are required to safely install, move and position
the proACTIV board.
Before lifting the proACTIV board into position, ensure the required
cables are connected to the electronics pod on the rear of the proACTIV
board.
Lift the proACTIV board up parallel with the wall and tilt the board
forward slightly, resting the bottom of the board on the bottom
brackets. Take extreme care to avoid the proACTIV board falling off the
brackets. Align the brackets on the rear of the proACTIV board with the
wall brackets and then lift it so that the brackets engage. The proACTIV
board should now slide down and the bottom should rest in the bottom
brackets. Ensure that all brackets are fully engaged.
Portable Stand
A portable stand, which is height adjustable, can be purchased separately,
contact Promethean for more information. To fix the proACTIV board, screw
the wall mounting brackets to the stand at the preferred height position.
Maximum load on proACTIV board stands must not exceed
30KG. Read all instructions before using the stand.
Never attempt to adjust the height of the stand without first
removing the proACTIV board from the stand.
Always ensure the two upper arm adjustment knobs are tight
prior to using your proACTIV board.