Product manual
VTrak E-Class Product Manual
90
Managing Background Activities
Background activity management includes:
• Viewing Current Background Activities (page 90)
• Viewing Scheduled Background Activities (page 90)
• Adding a Scheduled Background Activity (page 91)
• Changing a Background Activity Schedule (page 92)
• Enabling or Disabling a Scheduled Background Activity (page 93)
• Deleting a Scheduled Background Activity (page 93)
• Media Patrol (page 94)
• Redundancy Check (page 94)
• Initialization (page 95)
• Rebuild (page 96)
• Migration (page 96)
• PDM (page 97)
• Transition (page 98)
• Synchronization (page 98)
• Battery Reconditioning (page 99)
• Spare Check (page 99)
Background activities perform a variety of preventive and remedial functions on
your physical drives, disk arrays, logical drives, and other components.
You can run a background activity immediately or schedule it to run at a later
time. Scheduling options are described below.
Setting options for each activity are listed after the scheduling options. These
settings determine how the background activity affects I/O performance.
Viewing Current Background Activities
To view a list of scheduled background activities:
1. Click the AdminTool tab.
2. Click the Background Activities icon.
The list of background appears.
Currently running activities show a progress bar.
Viewing Scheduled Background Activities
To view a list of scheduled background activities:
1. Click the AdminTool tab.