Product manual

VTrak E-Class Product Manual
92
Until date from the dropdown menus.
12. For Redundancy Check, choose,
Auto Fix option – Attempts to repair the problem when it finds an error.
Check to enable
Pause on Error option – The process stops when it finds a non-
repairable error. Check to enable
Select LD – Check the boxes for the logical drives to run Redundancy
Check. Check at least one logical drive
13. Click the Save button.
Changing a Background Activity Schedule
To change an existing scheduled background activity:
1. Click the AdminTool tab.
2. Click the Background Activities icon.
The list of background appears.
3. Click the Scheduler button.
The list of currently scheduled background act it viti es appears.
4. Mouse-over the background activity and click the Settings button.
5. Make settings changes as required:
Choose a Start Time from the dropdown menus.
The menus have a 24-hour clock.
Choose a Recurrence Pattern option, daily, weekly, or monthly.
For the Daily option, enter an interval in the Every field.
For the Weekly option, enter an interval in the Every field and
choose one or more days of the week.
For the Monthly option, choose the Day of the Month option or the
day of the week option, and choose the day from the dropdown
menu.
Choose a Start From date from the dropdown menus.
Choose an End On option,
No end date or perpetual.
End after a specific number of activity actions.
Caution
Disabling the battery recondition schedule is NOT recommended.