Product manual

VTrak E-Class Product Manual
98
High – More system resources to PDM, fewer to data read/write
operations.
Highlight the current values in the block threshold fields and input new
values.
Reassigned block threshold range is 1 to 512 blocks.
Error block threshold range is 1 to 2048 blocks.
5. Click the Confirm button.
Transition
Transition is the process of replacing a revertible spare drive that is currently part
of a disk array with an unconfigured physical drive or a non-revertible spare drive.
See “Running a Transition on a Spare Drive” on page 144 and “Transition” on
page 284.
Making Transition Settings
To make Transition settings:
1. Click the AdminTool tab.
2. Click the Background Activities icon.
The list of background activities appears.
3. Click the Settings button.
4. Click the Transition Rate dropdown menu and choose a rate:
Low – Fewer system resources to Transition, more to data read/write
operations.
Medium – Balances system resources between Transition and data
read/write operations.
High – More system resources to Transition, fewer to data read/write
operations.
5. Click the Confirm button.
Synchronization
Synchronization is automatically applied to logical drives when they are created.
Synchronization recalculates the redundancy data to ensure that the working
data on the physical drives is properly in sync.
Mouse-over on the logical drive, click the View button, and look under Logical
Drive Information beside the line that says Synchronized. A Yes means the
logical drive was synchronized. See “Viewing Logical Drive Information” on
page 132.