Product manual

Chapter 3: Setup
This chapter covers the following topics:
Connecting the Power (below)
Setting up the Management Ports (page 36)
Logging into WebPAM PROe (page 42)
Creating Disk Arrays and Logical Drives (page 44)
Logging out of WebPAM PROe (page 49)
Connecting the Power
Plug the power cords and turn on the switches on both power supplies.
When the power is switched on, the LEDs on the right handle light up.
Figure 1. Front panel LED display
When boot-up is finished and the VTrak is functioning normally:
Power, FRU, and Logical Drive LEDs display steady green.
Important
If you have a SAN, DAS, or Cascade with JBOD Expansion,
always power on the JBOD expansion units first.
Power
FRU Status
Logical Drive Status
Controller 1 Activity
Controller 2 Activity
Controller Heartbeat