Product manual

VTrak E-Class Product Manual
68
6. Click the Confirm button.
When the controller shuts down, your WebPAM PROe connection is lost.
7. Wait no less than two minutes.
8. Manually turn OFF the switches on both power supplies.
Restarting a Subsystem after a Shutdown
To start the RAID subsystem:
1. Manually turn ON the power supply switches on the back of the subsystem.
2. Wait no less than two minutes.
3. Open your browser and log into WebPAM PROe.
If you cannot log in immediately, wait 30 seconds and try again.
Important
If your RAID subsystem manages JBOD expansion units, you
must follow the proper startup procedure.
Important
If your RAID subsystem manages JBOD expansion units, always
power on the JBOD expansion units first. Then power on the RAID
subsystem.