Product manual

Chapter 2: Installation
27
Management Path
To establish the management path:
1. Connect Ethernet cables between the Management ports on both RAID
controllers and the network switch.
See Figure 12.
2. Connect Ethernet cables between the network ports on both host PCs or
servers and the network switch.
If you have multiple VTrak subsystems, repeat steps 1 and 2 as required.
Figure 12.FC SAN management connections
The VTrak RAID subsystem is shown with SFP transceivers installed.
Management port
on controller 1
Network switch
Network connector
(motherboard or HBA)
Host PCs or servers
VTrak RAID subsystem
Management port
on controller 2