Installation & Assembly

Table Of Contents
GETTING STARTED
TOOLSAND MATERIALS:OOLS
BEFORE YOU BEGIN
*not included
Ensure that you have gathered all of the
required materials that are needed for
the installation.
Plumber’s Tape*
Shut o ffthe main water supply where the
new faucet is being installed.
PLANNING
Drill*
Thread Sealant*
Tape Measure* Level*
Hex Wrench
14mm
Socket Wrench*
Use the faucet’s PDF specification sheet as
a reference when planning your installation.
The specification sheet can be found and
downloaded from the product page on our
website.
WALL-MOUNT FAUCET
INSTALLATION
Hot Water
Cold Water
Wood blocking
between studs
Protective covers
enlarged view
We recommend consulting a professional if
you are unfamiliar with installing bathroom
xtures and plumbing. We accepts no
liability for any damage to the
oor, walls, plumbing, or personal injury
during installation.
For the following installation instructions for
your new Wall-Mount Faucet, it is assumed
that any old fixtures have been removed
and the water supply lines have been
relocated to the proper installation location.
WALL-MOUNT FAUCET
1. Prepare for installation by installing wood blocking
between the two studs where the faucet will mount.
The valve should be installed 2" behind the finished wall.
Important: Take into consideration the thickness of
your finished wall materials, such as a tile backsplash. If
your valve is installed too far behind your finished wall,
you may be left with insucient clearance to attach the
spout and handles.
2. Mount the rough-in valve into its prepared location.
Attach the valve body using the provided hardware. Use
a level to ensure that the valve is mounted completely
level.
Important: Leave the protective plastic sleeves on the
valve until your finished wall is completed.
3. Attach your existing water lines to the valve. Apply
thread sealant or plumbers tape to the threaded
connection to ensure a watertight seal.