Installation Guide

6
6
1
1
1
6
6. Attach supply lines (F) to shut-off valves and hand
tighten. Using two wrenches (not included), finish
with one-half turn. Do not overtighten.
7. Install the main plunger (AA) and the drain
assembly (DD) above sink. From below sink,
install the rubber washer (BB) and lock nut
(CC).
1
1
2
7
2
8
8. Connect 1-1/4” I.D. tail piece on pop-up drain
to waste outlet (not included). Check all drain
connections and P trap for leaks.
ASSEMBLY INSTRUCTIONS
6
2
3
1-popup
F F
AA
DD
BB
CC
Blue line
Red line