Full Product Manual

FIND OUT MORE AT PROTOCOLEQUIPMENT.COM
PREPARING THE SAWHORSE
5. After both sets of legs are deployed, lift sawhorse in an upright position.
6. Ensure sawhorse is stable and both sets of legs are fully opened.
5