Full Product Manual

FIND OUT MORE AT PROTOCOLEQUIPMENT.COM
PREPARING THE WORKSTATION
1. Place workstation on a flat and level surface with folded legs facing up.
2. Turn leg lock handle counterclockwise and unfold first set of legs from chassis.
CROSS BRACE
3. Deploy first set of legs. Make sure cross brace is secured in place to ensure legs are
fully opened.
4. Unfold second set of legs and follow step #3.
5