Instructions / Assembly
ITEMS YOU WILL NEED:
• Drill/power screwdriver
• Miter or circular saw with
carbide-tipped blade
• Tape measure
• Carpenter's level
This rail may only be used in residential applications. Prior to
construction, check with your local regulatory agency for special code
requirements in your area. Typical requirements are minimum height
from the walking surface to the top of the top rail of 36". All gaps are
typically required to be less than 4". This rail kit is designed to be used
with structural 4x4 posts properly secured at 6' on-center (o.c.) spacing.
Pre-drill all screw locations to minimize splitting.
Preparation for Moulded Line Rail Kit
• Carpenter's pencil
• Quick clamps
• Speed square
• Safety glasses/goggles
• Gloves
STEP 1: Measure the distance between posts and cut the rails to size. Remove an additional 1/4" from each end for the bracket to fit between
the post and rail.
STEP 2: For a 6' o.c. rail with 4x4 posts, 15 balusters are needed. Find the center of the bottom rail. Center the pre-drilled insert rail on the
bottom rail and clamp in place. Mark each hole location. Remove the insert rail and pre-drill using a 1/8" drill bit.
STEP 3: Place a bracket on each end of the bottom rail. Pre-drill and attach each bracket using the screws provided.
Moulded Line Rail Kit Installation Instructions
BALUSTER STYLE ROUND AND SQUARE ALUMINUM BALUSTERS
• Tip: Position the bottom rail with the groove facing down, so it doesn’t collect water.
• Fasten a baluster connector at each pre-drilled location on the bottom rail.
• Determine the sweep beneath the bottom rail.
• Attach the support block to the center of the bottom rail using the 3-1/2" screw.
• Prop the bottom rail in place between posts and level.
• Pre-drill the screw locations through the brackets and attach all four screws
halfway, then fully fasten each screw. This will help keep
36
1
16
"
3
5
8
"
3
5
16
"
68"
3
3
4
"
4
1
2
"
o.c.
72"
MOULDED RAILING KIT
INSTALLATION INSTRUCTIONS
For 6 ft. line and stair rail kits
the rail centered while fastening.
• Center the insert rail on the bottom of the top rail
and attach a baluster connector through each
hole. Take care while pre-drilling to avoid going
through the top of the rail.
• Attach a bracket to each end of the top rail.
• Slide a baluster onto each connector installed
on the bottom rail.
• Install the top rail, fitting balusters onto the
connectors from one end to the other.
• Attach the top rail to the posts using the brackets.
©2023 UFP Retail Solutions, LLC. ProWood is a registered trademark of UFP Industries, Inc. All rights reserved. 13469_11/23
ProwoodLumber.com