User's Manual
Installation and Initialization MP.11 4954-R Installation and Management
Hardware Installation
19
Hardware Installation
This section describes the steps required to install and mount the unit, and to align the antenna. The installation
procedure does not include the mounting and connection of antennas. See the documentation that accompanies the
antenna and the Tsunami MP.11 Antenna Installation Guide for this information.
NOTES:
• Be sure to read the Release Notes file on the product CD as it contains software version and driver information
that may not have been available when this document was produced.
• Equipment is to be used with, and powered by, the power injector provided or by a power injector that meets
these requirements:
– UL-Listed/ITE (NWGQ)
– Limited Power Source Output per UL/IEC 60950
– CE-marked
– Approved for Power-over-Ethernet
– Rated output, 48 Vdc/0.42 A
– Pinout follows 802.3af standard for mid-span devices
See the following sections for installation instructions:
• Step 1: Choose a Location
• Step 2: Unpack Shipping Box
• Step 3: Assemble the Cable
• Step 4: Determine Proper Mounting Orientation
• Step 5: Assemble Mounting Hardware
• Step 6: Mount the Unit
• Step 7: Plug in the Cables
• Step 8: Power on the Unit
• Step 9: View LEDs
• Step 10: Align the Antenna
• Step 11: Tighten the Cables
• Step 12: Weatherproof the Connectors
• Step 13: Install Documentation and Software
IMPORTANT:
Before installing and using this product, see Safety and Regulatory Compliance Information on the
product CD.
WARNING:
To ensure proper grounding, use the hole at the bottom point on the back of each unit and the provided
grounding screws to attach a ground wire of at least 10 AWG stranded to each unit. Use proper wire
grounding techniques in accordance with local electric codes.