User's Manual

8000 Series - Hardware Overview and Installation
Tsunami
®
800 and 8000 Series - Hardware Installation Guide 66
Step 7: Mount the Device
1. To pole-mount the device, insert the provided screws and washers through bracket (F). Fasten around the pole to
bracket (C) and secure (Torque 11 N.m/100 in-lbs).
Figure 3-19 Pole Mounting
2. To wall-mount the device, mount the bracket (C) to a wall using 4 screws (not provided), as shown:
Figure 3-20 Wall Mounting
Step 8: Plug in the Cables
: Unscrew the sealing cap for installation of the cable.
1. Plug one end of the straight-through Cat5e/Cat6 cable into the Ethernet Port 1 of the device by following the
Weatherproofing steps as explained in Step 5. Connect the other end of the cable into the PWR LAN-OUT port on
the PoE Injector.
: Always use a straight cable from PoE to the device. When you use a 4-pair cross over ethernet cable, the reload
functionality gets activated and forcibly deletes the operating image.
Figure 3-21 Cable Plugged In
2. Plugging in the second Cat5e/Cat6 cable into the Ethernet Port 2 interface of the device is optional. While using the
second Ethernet Port for PoE OUT and data, the following should be considered:
48 VDC (15 W average) is present on the second Ethernet port. Make sure the connected device can support this
voltage.
If power from the second Ethernet Port is desired, then Proxim recommends to use 60W PoE (not supplied).
If the device is connected to the second Ethernet port for data, then use a PoE Splitter (not supplied).