Specifications

Installation and Initialization Tsunami MP.11 5012-SUR Installation and Management
Installation Procedure
21
Step 5: Close Cable Compartment
1. Ensure that the Ethernet cable is properly routed and exiting the unit through the notch at the bottom of the cable
compartment.
2. Position the cable cover so that the notch in the cover fits over the Ethernet cable (not pictured) and the large tabs on
the cover are aligned below the holes in the unit.
3. Align the small tabs in the bottom cover with the holes in the unit.
4. Slide cover upward until all tabs (large and small) on the cover snap into their respective holes on the enclosure.
The final assembly is shown below.
Hole
Tab
Hole
Tab
Hole
Tab
Hole
Tab