Installation and Operation Guide

Table Of Contents
5
VIBCONNECT RF 05.2012
Introduction
Chapter 1: Introduction
1.1 First steps
Checking delivery
Please check the delivered goods without delay for defects or
missing parts. If your delivery is incomplete or you detect defective
parts, mark the respective components on the freight dockets and
contact the shipping company or local PRÜFTECHNIK sales partner.
Responsibilities
The operator of the machine must ensure that:
All applicable statutory regulations, including safety, accident
prevention and environmental protection regulations, and the
recognized technical safety rules are strictly adhered to
All tasks for the proper installation of the system components
are performed
The system is installed by a qualified specialist technician
All components and tools required for the installation are avail-
able on site (see also chapter “Installation”)
Electric power and a data network connection that conforms to
the specifications are available on site
A potential equalization connection is available on site
1.2 Service addresses
If you have any queries, contact us:
Hotline: +49 89 99616-0
E-mail: info@pruftechnik.com
Fax: +49 89 99616-300
PRÜFTECHNIK Condition Monitoring GmbH
Oskar-Messterstr. 19 – 21,
857373 Ismaning, Germany
Note
When calling our hotline, please have the serial number of the
respective component at hand.