User's Manual
October 23, 2007
DPD A00332 A00 Sheet 1 of 7
WORKABOUT PRO RFID MODULE LF-AIR200-G2-XMOD
EXPANSION MODULE INSTRUCTIONS
Important: All Approval and safety information is outlined in the ‘Workabout pro G2
Handheld-computer User Manual’ – part number 8100140A. This manual is available on
our website www.psionteklogix.com through the Teknet extranet
Installation of the RFID Module LF-AIR200-G2-XMOD:
Easily installable expansion modules for the WORKABOUT PRO allow you to customise this hand-held to
meet your specific mobile computing requirements. This chapter outlines how to install the RFID Module
LF-AIR200-G2-XMOD and the external RFID Antenna LF-AEA120-G2.
Before installing a module in the WORKABOUT PRO G2, all power sources must be turned off.
• Remove the batteries. If your unit is using AC power, disconnect it.
• Slide the switch to position OFF to shut off internal battery power.
With the power shut down, you can install the RFID Module LF-AIR200-G2-XMOD.
• Remove and discard the two screws on the bottom of the metal frame.
• Put the adapter board in the same alignment of the expansion connector on the WORKABOUT
PRO. Apply slight pressure to snap the module into place on the hand-held.