User's Manual
July 10, 2007
DPD A00285 A00 Sheet 1 of 5
WORKABOUT PRO G2 RFID MODULE HF/LF G2
EXPANSION MODULE INSTRUCTIONS
Important: All Approval and safety information is outlined in the ‘Workabout pro G2
Handheld-computer User Manual’ – part number 8100140A. This manual is available on
our website www.psionteklogix.com through the Teknet extranet
Easily installable expansion modules for the WORKABOUT PRO G2 allow you to customise this hand-
held to meet your specific mobile computing requirements. This chapter outlines how to install the RFID
Module HF/LF G2.
Before installing a module in the WORKABOUT PRO G2, all power sources must be turned off.
• Remove the batteries. If your unit is using AC power, disconnect it.
• Slide the switch to position OFF to shut off internal battery power.
With the power shut down, you can install the RFID Module HF/LF G2.
• Connect the USB connector on the RFID Module.
• Slide the PCB guide in the Multi purpose End Cap.
• Slide the RFID Module in the PCB guide.
• Screw the stopper.
RFID Module HF-AM1-G2 RFID Module HF-T2-G2
RFID Module LF-AH1-G2