Owner's manual
- 4 -
INSTALLATION
1. Ensure the Backup Power System is powered off and disconnected from both
AC and DC power.
2. Remove the Pre-Charge Kit from the positive (RED) battery lead ring. Open
the Pre-Charge Kit and wrap one of the resistor wires around the positive
(RED) battery lead ring.
3. Using the end not connected to the resistor wire, connect the positive (RED)
battery lead to the positive (RED) terminal on the Backup Power System.
Tighten the terminal retention knob securely by hand. Do not use any tools
to tighten as this may break the retention knob.
4. Connect the negative (BLACK) battery lead to the negative (BLACK)
terminal on the Backup Power System. Tighten the terminal retention knob
securely by hand. Do not use any tools to tighten as this may break the
retention knob.
5. Connect the negative (BLACK) battery lead to the negative (BLACK)
terminal on the 12VDC Deep Cycle Battery. Secure the connection per the
battery manufacturer’s recommendation.
6. Touch and hold the free end of the resistor wire to the positive (Red)
terminal on the battery for 3 seconds. Completely remove the resistor wire
from the positive (RED) battery lead ring.
7. Connect the positive (RED) battery lead to the positive (RED) terminal on
the 12VDC Deep Cycle Battery. Secure the connection per the battery
manufacturer’s recommendation.
8. Plug the Backup Power System into a 120VAC outlet.
9. Conrm that the power switch is in the OFF position. Plug your sump
pump(s) into either of the two 120VAC outlet receptacles.
10. Flip the power switch into the ON position.
11. Allow the Backup Power System to charge the battery until the “Full” status
indicator LED is BLUE.
12. Test the AC power functionality by manually activating the connected sump
pump(s).
13. Test the DC power functionality by unplugging the Backup Power System
from the 120VAC outlet to simulate a power outage. Then, manually
activate the connected sump pump(s).
14. Reconnect the Backup Power System to a 120VAC outlet.
ATTENTION
An optional grounding wire is included to connect the Primary Sump Pump
Backup Power System’s case to the mounted wall.